iWriteGigs

Fresh Grad Lands Job as Real Estate Agent With Help from Professional Writers

People go to websites to get the information they desperately need.  They could be looking for an answer to a nagging question.  They might be looking for help in completing an important task.  For recent graduates, they might be looking for ways on how to prepare a comprehensive resume that can capture the attention of the hiring manager

Manush is a recent graduate from a prestigious university in California who is looking for a job opportunity as a real estate agent.  While he already has samples provided by his friends, he still feels something lacking in his resume.  Specifically, the he believes that his professional objective statement lacks focus and clarity. 

Thus, he sought our assistance in improving editing and proofreading his resume. 

In revising his resume, iwritegigs highlighted his soft skills such as his communication skills, ability to negotiate, patience and tactfulness.  In the professional experience part, our team added some skills that are aligned with the position he is applying for.

When he was chosen for the real estate agent position, he sent us this thank you note:

“Kudos to the team for a job well done.  I am sincerely appreciative of the time and effort you gave on my resume.  You did not only help me land the job I had always been dreaming of but you also made me realize how important adding those specific keywords to my resume!  Cheers!

Manush’s story shows the importance of using powerful keywords to his resume in landing the job he wanted.

Quiz Chapter 2

Navigation   » List of Schools  »  San Diego State University  »  Business Administration  »  BA 360 – Introduction To Operations and Supply Chain Management  »  Spring 2022  »  Quiz Chapter 2

Need help with your exam preparation?

Below are the questions for the exam with the choices of answers:

Question #1
A  The duration of the critical path is the average duration of all paths in the project network.
B  The shortest of all paths through the network is the critical path.
C  On a specific project, there can be multiple critical paths, all with exactly the same duration.
D  Every network has only one critical path.
E  Some activities on the critical path may have slack.
Question #2
A  All of these are true.
B  Gantt charts use the four standard spines of Methods, Materials, Manpower, and Machinery.
C  Gantt charts are expensive.
D    
E  Gantt charts give a timeline and precedence relationships for each activity of a project.
F  Gantt charts are visual devices that show the duration of activities in a project.
Question #3
A  Immediate Predecessor
B  Critical Path
C  Work Breakdown Structure (WBS)
D  PERT analysis
E  Forward and Backward Pass
Question #4
A  normal organization.
B  fixed project organization.
C  standard organization.
D  matrix organization.
E  permanent project organization.
Question #5
A  exaggerated expense reports.
B  pressure to mask delays with false status reports.
C  compromised quality standards to meet bonuses or avoid penalties related to schedules.
D  gifts from contractors.
E  All of these.
Question #6
A  planning, organizing, staffing, leading, and controlling.
B  planning, scheduling, and controlling.
C  GANTT, CPM, and PERT.
D  different for manufacturing projects than for service projects.
E  planning, programming, and budgeting.
Question #7
A  The crash time always exceeds the normal time.
B  Crashing is not possible unless there are multiple critical paths.
C  Crashing shortens the project duration by assigning more resources to one or more of the critical tasks.
D  Activities not on the critical path can never be on the critical path, even after crashing.
E  Crashing a project often reduces the length of long-duration, but noncritical, activities.
Question #9
A  Only critical activities contribute to the project variance.
B  Each activity has two estimates of its duration.
C  The most likely time is equivalent to the expected activity time.
D  Project standard deviation is the sum of all critical activity standard deviations.
E  Project variance is the sum of all activity variances.
Question #11
A  If a specific project has multiple critical paths, all of them will have the same duration.
B  The early finish of an activity is the latest early start of all preceding activities.
C  The late start of an activity is its late finish plus its duration.
D  There can be multiple critical paths on the same project, all with different durations.
Question #12
A  Only one path is optimal
B  The project will not be completed by the desired time
C  You have multiple critical paths
D  You have incorrectly performed the analysis
Question #13
A  The duration of this activity is 2
B  The Late Finish is 12
C  The slack for this activity is 2
D  The activity is on the critical path
E  The Early Finish is 10